DAY WORK:
During weekdays, Monday through Friday from 6:00 AM to 3:30 PM crews will conduct a variety of work as noted throughout the I-91, I-691, Route 15 Interchange Phase 2 Project limits:
- Maintenance and protection of traffic with lane and shoulder closures on I-91, I-691, and Route 15, and some local roads, as required.
- Maintain stockpile locations, sweeping, dust control.
- Excavate, backfill, form subgrade and place process aggregate base along Route 15 NB from south of Paddock Avenue to the Route 15 NB Bridge over I-91 south of the East Main Street.
- Excavate, backfill, form subgrade, place process aggregate base, and install temporary earth retaining system on the I-91 NB Exit 16 ramp and the Route 15 NB Exit 67 off-ramp.
- Install support of excavation for the Route 15 NB Bridge over I-91 North of East Main Street, and set and strip formwork at the pier abutment.
- Install concrete curbing for the on-ramp to Route 15 NB and I-91 NB from East Main Street.
- Install drainage swales in the median of I-691 WB.
- Prep for underpinning the Route 15 NB Exit 58 W Bridge to I-691 WB.
- Excavate and backfill and excavate and install temporary earth retaining systems at various retaining walls.
- Formwork on retaining walls and parapets.
- Set and strip formwork for deck, parapets and approaches to the Route 15 NB Bridge over I-91 south of the East Main Street.
- Prep, pour, cure, and rub concrete at various locations.
- Set and strip formwork at the Paddock Avenue Bridge.
- Pier pedestals repair at the East Main Street Bridge over Route 15.
- Set and strip formwork on abutment 2 of the I-91 WB Bridge over Gravel Street.
- Set and strip formwork on abutment footings for the I-691 WB Bridge over Route 15.
- Install illumination structures at various locations
- Onsite/offsite trucking.
NIGHTTIME LANE and/or Road CLOSURES:
Closures are possible Sunday through Friday nights from 6:00 PM to 6:00 AM as follows for bridge reconstruction work:
NIGHT WORK:
Sunday through Friday nights from 7:00 PM to 6:00 AM, crews will conduct a variety of work as noted below throughout Project limits:
- Top course paving on I-91 NB
- Installation of micropiles at Paddock Avenue Bridge
- Pier pedestals repair at the East Main Street Bridge over Route 15.
LONG-TERM CLOSURES/TRAFFIC PATTERNS:
Paddock Avenue: one-way alternating traffic controlled by a temporary traffic signal, and nighttime closure/detour on Paddock Avenue over Route 15 between Barr Road and Overlook Road: read more here.