HOLIDAY SCHEDULE:
For the week of November 22, there will be no worked scheduled in the project limits from 2:30 PM on Wednesday, November 25 through Monday, November 27 at 6:30 AM. No lane closures are anticipated except in an emergency.
DAYTIME WORK:
Except for the holiday schedule, Monday through Friday from 7:00 AM to 3:30 PM crews will conduct a variety of work as noted throughout the Phase 2 Project limits:
- Excavate, backfill, formation of subgrade, place aggregate on the following areas:
- I-691 WB from the I-691 WB bridge over Route 15 and install permanent barrier
- The Route 15 NB 65B ramp to I-691 WB.
- Route 15 NB and the I-91 NB median.
- Work on the Route 15 NB Bridge over I-91 north of East Main Street:
- Backfill footings and wall of the piers
- Pour stem and backwall, and set and strip formwork for footings, wingwalls, back walls, pedestals, pier footings, columns, and cap.
- Install rebar
- Permanent paving on Route 15 NB 65B ramp to I-691 WB and on Route 15 NB at the Route 15 NB bridge over I-91 north of East Main Street.
- Work on multiple retaining walls.
- Remove bituminous wearing surface on the I-691 WB Bridge over Gravel Street
- Set and strip formwork on the bridge deck of the I-691 WB Bridge over Route 15.
- Demolish pedestals for the East Main Street Bridge and perform steel repairs.
- Prep, pour, cure, patch and install penetrating sealer at various locations.
- Install:
- Metal beam rail at multiple locations
- Drainage in the I-91 and Route 15 medians.
- Signals and traffic foundations on East Main Street.
NIGHTTIME WORK
Except for the holiday schedule, Sunday through Thursday nights from 7:00 PM to 6:00 AM crews will conduct a variety of work. Please read about our night time noise and construction work here.
- Lane and ramp closures/stoppages on I-91, I-691, and Route 15.
- Relocate temporary barrier on I-91, I-691, and Route 15 ramps at various locations.
- Bridge work and sawcutting in various locations
- Pour bridge deck the Route 15 Bridge over I-91 north of East Main Street
- Traffic shift at I-691 WB and the Route 15 NB ramp to I-691 WB.
- Install:
- Penetration sealer on various bridges
- Winter epoxy at various locations
NIGHT WORK—Lane Closures:
Except for the holiday schedule, Sunday through Thursday nights from 7:00 PM to 6:00 AM.
- I-91 NB and SB (Exit 16-18) to clean and blast the East Main Street Bridge and bridge underdecking removal.
- I-691 WB (Exit 2C to Exit 1A) for temporary barrier relocation.
- Route 15 SB (Exit 64B to Exit 64A) for bridge underdecking removal and fine grade and pave at the gore of the Exit 65B ramp.
- I-691 WB (the on-ramp from Preston Avenue to Exit 2A) for traffic shift.
NIGHT WORK—Ramp Closures:
Except for the holiday schedule, Sunday through Thursday nights from 7:00 PM to 6:00 AM. Detour routes will be in place to guide travelers through the construction.
- I-91 NB Exit 16 for winter epoxy striping (Sunday 11/15).
- Route 15 NB Exit 64B for winter epoxy striping (Sunday 11/15 through Tuesday 11/17) and to clean and blast the East Main Street Bridge.
- Route 15 NB Exit 65B for temporary barrier relocation (Sunday 11/15 through Thursday 11/19) and fine grade and pave at the gore of the Exit 65B ramp
- Route 66 on-ramp from Preston Avenue for traffic shift (Monday 11/16)
- Route 66 WB Exit 1A for traffic shift (Monday 11/16)
NIGHTTIME WORK – BRIDGE DEMOLITION/CONSTRUCTION:
- Except for the holiday schedule, Sunday through Thursday nights from 8:00 PM to 6:00 AM – Please read information concerning our nighttime noise monitoring efforts here.
LONG-TERM CLOSURES/TRAFFIC PATTERNS:
- The On-ramp to Route 15 NB, I-91 NB and I-691 EB from East Main Street is closed temporarily for roadway construction and safety. Read more and see detour map by clicking this link.
SAFETY ALERT! ONE WAY; DO NOT ENTER:
Click this link to learn more about not using the off-ramps at East Main Street to enter highways.