DAYTIME WORK:
Monday through Friday from 7:00 AM to 3:30 PM crews will conduct a variety of work as noted throughout the Phase 3 Project limits:
- Maintain water handling at multiple sites of culvert rehabilitation
- Culvert rehabilitation at multiple sites
- Haul in stockpile supplemental streambed material and install at required sites
- Sawcut, excavate, and backfill in the I-91 SB median from north end of project limits to Exit 17 for the added lane
- Sawcut, excavate, and backfill in the I-91 SB right shoulder and Route 15 SB median
- Excavate for and install support of excavation, and partial demolition of the Route 15 SB ramp bridge to I-91 SB over the I-91 SB ramp to Route 15 SB
- Demolition of Murdock Avenue pier and excavate for pier footing
- Removal of existing masonry and installation of parapet caps, curb and deck ends on the I-691 EB Bridge over Gravel Street
- Construction staking sitewide
- Joint repairs and sealing culverts at multiple bridges
- Install drainage in Route 15 SB median near Paddock Avenue
- Install drainage on I-91 SB median north end at the East Main Street ramp to I-91 SB
DAYTIME LANE CLOSURES: Sunday through Thursday from 8:00 AM to 2:00 PM:
- I-91 SB lane closures (Murdock Avenue to Exit 15) for shoulder reconstruction
NIGHTTIME WORK:
Sunday through Friday nights from 7:00 PM to 6:00 AM crews will conduct a variety of work as noted:
- Pave top courses on I-91 SB from Murdock Avenue to the southern end of the project limits
- Maintenance of existing illumination
- Line striping for I-91 SB
- Murdock Avenue bridge work over 91 NB & SB
NIGHTTIME LANE CLOSURES:
Sunday through Friday nights from 8:00 PM to 6:00 AM crews will conduct a variety of work with lane closes as noted:
- I-91 NB & SB (from Exit 17 to Exit 15) for Murdock Avenue Bridge work and paving
- I-91 SB (on-ramp from Route 15 NB Exit 15) for survey
NIGHTTIME RAMP CLOSURES: Monday night, 10/13, from 9:00 PM to 6:00 AM:
- I-91 SB (East Main Street to I-91 SB)
NIGHTTIME ROAD CLOSURES:
Sunday through Friday nights from 12:00 AM to 6:00 AM
- I-91 NB & SB—15-minute closures for bridge work on the Murdock Avenue bridge
NIGHTTIME WORK – BRIDGE DEMOLITION/CONSTRUCTION: Sunday through Thursday nights from 8:00 PM to 6:00 AM
Please read information concerning our nighttime noise monitoring efforts here.
LONG TERM CLOSURES:
- Murdock Avenue Bridge alternating one-way traffic–Read more on our website here.