Lane Closures possible Sunday 11/5 through Wednesday 11/15 between 7:00 PM and 6:00 AM as follows (except no lane closures are anticipated Thursdays, Fridays, and Saturdays during these two weeks):
- I-91 NB (Exit 17 to Exit 18) double right lane closure for temporary barrier installation and bridge haunch removal – Sunday, 11/5, Monday, 11/6, Tuesday 11/14, and Wednesday, 11/15 between 8:00 PM and 6:00 AM.
- I-91 NB (Ramp 9N 6 E) ramp show-down for temporary barrier installation – Sunday, 11/5 and Monday, 11/6, between 8:00 PM and 6:00 AM.
- CT Route 66 EB (Ramp 9N 6E to Ramp 6EPA ) right lane closure, Monday, 11/6, for temporary barrier installation
- CT Route 66 WB (Ramp PA 6W to Ramp 6W9N) right lane closure, Tuesday, 11/7, for temporary barrier installation
- I-691 EB (Exit 1B to Exit 1) double left lane closure for temporary barrier installation – Tuesday, 11/7 and Sunday, 11/12 between 7:00 PM and 6:00 AM.
- I-691 EB (Exit 1B to Exit 1) double left lane closure for strategic asbestos removal – Sunday, 11/12 between 7:00 PM and 6:00 AM.
- I-691 EB (Exit 1B to Exit 1) right shoulder closure for strategic asbestos removal – Monday, 11/13 between 7:00 PM and 6:00 AM.
- I-691 EB (Exit 17 to Exit 20) double right lane closure for traffic shift– Wednesday, 11/8, between 7:00 PM and 6:00 AM.
Ramp Closures (Between 10:00 PM and 6:00 PM) – Click for detour maps
- 11/7 — I-691 WB (Ramp 6W 9N) Ramp closure for strategic asbestos removal
- 11/7 — I-691 EB (Ramp 6E 9N) Ramp closure for strategic asbestos removal
- 11/13 — I-691 WB (Ramp 6W 9S) Ramp closure for bridge haunch removal