Phase 2: Update for the Weeks of June 30 & July 7, 2025

HOLIDAY SCHEDULE NOTICE:

There will be no closures on the project from Thursday morning, July 3, 6:00 AM to Monday morning, July 7 at 6:00 AM over the Fourth of July Holiday.

NIGHTTIME LANE CLOSURES:

Except for the Holiday schedule, closures are possible Sunday through Friday nights from 8:00 PM to 6:00 AM as follows:

  • I-91 NB (exits 15-18) for drainage work and shoulder reconstruction
  • Route 15 NB and SB (Miller Avenue to Paddock Avenue) for steel girder installation
  • East Main Street (East Main Street Bridge) for bridge reconstruction work

NIGHT WORK:

Except for the Holiday schedule, during the Sunday through Friday nights from 7:00 PM to 6:00 AM, crews will conduct a variety of work as noted below throughout Project limits:

  • Paddock Avenue Bridge and Route 15 Nighttime Closures for bridge girder installation: read more here.
  • Work on the East Main Street bridge
  • I-91 NB: Sawcut for concrete pavement replacement

DAY WORK:

Except for the Holiday schedule, during weekdays, Monday through Friday from 6:00 AM to 3:30 PM crews will conduct a variety of work as noted below throughout the I-91, I-691, Route 15 Interchange Phase 2 Project limits:

  • Maintenance and protection of traffic with lane and shoulder closures on I-91, I-691, and Route 15, and some local roads, as required.
  • Maintain stockpile locations, sweeping, dust control.
  • Excavate, backfill and dewater temporary earth retaining for retaining wall on Route 15 NB north of Paddock Avenue Bridge over Route 15 and install precast concrete blocks.
  • Install precast concrete blocks at various retaining wall locations
  • Excavate, backfill, form subgrade, and shape slopes on Route 15 north of Paddock Avenue
  • Form and pour leveling pads for retaining walls along the I-91 NB and Route 15 NB Exit ramps to East Main Street and install precast concrete blocks.
  • Install damp-proofing on the bridge abutments for the Paddock Avenue bridge over Route 15
  • Install support of excavation for the I-691 WB bridges over Gravel Street and Route 15
  • Demolish pedestals on Pier one at the East Main Street bridge and pour stage one deck ends
  • Install soil nail wall at the I-691 WB bridge over Gravel Street
  • Install rebar for the pier for the Route 15 NB bridge over I-91 south of East Main Street
  • Install I-91 median light bases
  • Install permanent drainage at various location
  • Install formwork for bridge deck for the new Route 15 Exit 67 bridge to East Main Street
  • Prep, pour, cure, patch, and rub concrete at various locations as required
  • Onsite/offsite trucking

LONG-TERM CLOSURES/TRAFFIC PATTERNS:

Paddock Avenue: one-way alternating traffic controlled by a temporary traffic signal, and nighttime closure/detour on Paddock Avenue over Route 15 between Barr Road and Overlook Road: read more here.