Phase 2: I-91 NB and Route 15 NB temporary Exit ramp closures to East Main Street Begin Sunday, April 19

Ramp closures for the full depth roadway reconstruction will be performed at I-91 Northbound (NB) Exit 16 and Route 15 NB Exit 64-B to East Main Street in the City of Meriden.

This work is scheduled to occur continuously from Sunday, April 19, at 6:00 PM to Sunday, May 3, 2026 at 6:00 PM.

The ramps from I-91 NB Exit 16 and from Route 15 NB Exit 64-B to East Main Street in the town of Meriden will be closed continuously starting Sunday, April 19, at 6:00 PM to Sunday, May 3, 2026 at 6:00 PM. Detour maps are below. Traffic will be detoured as follows:

I-91 NB Exit 16 to East Main Street Closure and Detour: Take Exit 17

  • Take Exit 17 to Route 15 NB
  • Take Exit 65-A
  • Keep right and take Exit 18 to Route 66 EB
  • Take Exit 1 to Preston Ave.
  • Right onto Preston Ave.
  • Straight to E. Main St.

Route 15 NB Exit 64-B to East Main Street Closure and Detour; Take Exit 65-A

  • Continue on Route 15 NB and take Exit 65-A onto Route 91 NB
  • Stay in right lane to take Exit 18 to Route 66 EB
  • Take Exit 1 to Preston Ave.
  • Right onto Preston Ave.
  • Straight to E. Main Street
Detour map of the I-91NB Exit 16 ramp closure to E. Main St.
Previous Post
Phase 3: Nighttime Clearing Operations Announced
Next Post
Detour Route During Paddock Avenue Closures