Phase 2: Update for the Weeks of July 21 & 28, 2024

NIGHT WORK

Week of July 21 2024 from 8:00 PM to 6:00 AM (Sunday through Thursday nights)

Lane and Shoulder Closures

  • I-91 NB – Exits 15 – rest area: right lane and/or double right lane closures for temporary barrier installation
  • I-91 NB – Exit 16 NB off ramp: left shoulder closure for pipe crossing
  • Route 15 NB – Paddock Avenue to East Main Street: for pipe crossing

Ramp Closures
Monday 7/22

  • I-91 NB Exit 16 NB off ramp for temporary barrier installation

Monday 7/22 through Thursday 7/25

  • Route 15 NB Exit 67 off ramp for barrier pinning
  • East Main Street on-ramp to Route 15 NB and I-91 NB, I-691 WB for barrier pinning
  • Route 15 NB Exit 68 N-E off ramp for barrier pinning

Week of July 28, 2024 from 7:00 PM to 6:00 AM

Lane and Shoulder Closures

  • I-91 NB – Exits 15 – rest area: right lane and/or double right lane closures for temporary barrier installation
  • Route 15 NB – left lane closure Exit 67 to 68 NE for Route 15 traffic shift
  • Route 15 NB – right lane closure Miller Avenue to Exit 67 for barrier pinning

Ramp Closures
Monday 7/29

  • I-91 NB Exit 16 NB off ramp for temporary barrier installation
  • East Main Street on-ramp to Route 15 NB and I-91 NB, I-691 WB for barrier pinning

Monday 7/29 through August 1

  • East Main Street on-ramp to Route 15 NB and I-91 NB, I-691 WB for barrier pinning and temporary barrier installation
  • Route 15 NB Exit 68 N-E off ramp for barrier pinning

DAY WORK

During weekdays, Monday, July 22 through Friday, August 2, from 6:00 AM to 3:30 PM crews will conduct a variety of work as noted below on throughout the I-91, I-691, Route 15 Interchange Phase 2 Project limits:

  • Maintenance and protection of traffic with lane and shoulder closures on I-91, I-691, and Route 15, and some local roads
  • Excavate, backfill and form subgrade on Route 15 NB
  • Excavate and backfill slope for camera pedestal at Paddock Avenue
  • Strip topsoil in the wetland creation area and wetland work
  • Install cofferdam streambed material
  • Formwork for the Route 15 NB bridge over I-91 abutment wingwall and footings
  • Sawcutting for roadway widening on the I-91 NB Exit 16 off-ramp
  • Utilities work

DETOUR ROUTES (See maps in image slider below):

East Main Street on-ramp to Route 15 NB, I-91 NB, & I-691 WB Ramp closure.

  • Take right on East Main Street
  • Left onto Preston Avenue
  • Left onto ramp for I-691 WB
  • Take Exit 1A for I-91 NB
  • Take Exit 10 for Route 15 NB

Route 15 NB off ramp (Exit 68 NE) to I-91 NB and Route 66 EB closure.

  • Continue on Route 15 NB and take Exit 68 W onto Route I-691 WB
  • Take Exit 2B and left at the end of ramp onto State Street
  • Left onto Lake Street
  • Straight onto ramp for I-691 EB (this will turn into Route 66 EB at I-91 overpass vicinity)
  • Take Exit 1A for I-91 NB

Route 15 NB (Exit 67) to East Main Street in Meriden closure.

  • Continue on Route 15 NB and take Exit 68 NE onto Route 91 NB
  • Stay in right lane to take Exit 18 to Route 66 EB
  • Take Exit 1 to Preston Avenue
  • Right onto Preston Avenue

I-91 NB Exit 16 to East Main Street closure.

  • Take Exit 17 to Route 15 NB
  • Take Exit 68 NE
  • Keep right and take Exit 18 to Route 66 EB
  • Take Exit 1 to Preston Avenue
  • Right onto Preston Avenue
  • Straight to East Main Street