Construction Alert for the Weeks of October 16 and October 21, 2023

Lane Closures possible Tuesday 10/17 through Wednesday 10/25 between 7:00 PM and 6:00 AM  (except no lane closures on Saturday, 10/21) as follows:

  • I-91 NB (Exit 17 to Exit 20) double right lane closure for keyway milling, rumble strip removal, and shoulder strengthening – Tuesday, 10/17, Wednesday, 10/18, and Thursday, 10/19, between 9:00 PM and 6:00 AM.
  • I-691 EB (Exit 10 to Exit 12) double left lane closure for keyway milling and rumble strip removal – Tuesday, 10/17, and Thursday, 10/19, between 7:00 PM and 6:00 AM.
  • I-691 EB (Exit 10 to Exit 12) double left lane closure for shoulder strengthening – Friday, 10/20, between 9:00 PM and 6:00 AM.
  • I-691 EB (Exit 10 to Exit 12) double right lane closure for paving – Sunday, 10/22 between 9:00 PM and 2:00 AM.
  • I-691 EB (Exit 10 to Exit 12) double left lane closure for paving – Sunday, 10/22, between 2:00 AM and 6:00 AM.
  • I-91 NB (Exit 17 to Exit 20) double right lane closure for traffic shift– Monday, 10/23, and Tuesday, 10/24, between 9:00 PM and 12:00 AM.
  • I-91 NB (Exit 17 to Exit 20) double left lane closure for traffic shift– Monday, 10/23, and Tuesday, 10/24, between 12:00 AM and 6:00 AM.
  • I-91 NB (Exit 17 to Exit 20) double left lane closure for traffic shift– Wednesday, 10/25, and for temporary barrier installation between 9:00 PM and 6:00 AM.

Ramp Closures

  • 10/24 – Preston Ave. on-ramp to I-91 NB closed from 10:00 PM to 6:00 AM
  • 10/30 – I-691 EB Exit 1A closed from 10:00 PM to 6:00 AM (Ramp 6E 9N)
  • 10/30 – Route 66 WB Exit 1A closed from 10:00 PM to 6:00 AM (Ramp 6W 9N)

Click here for detour route maps

Next Post
Construction Alert for the Week of October 29
Previous Post
Lane Closures Begin Sunday Night, October 1, 2023