Phase Three – In Design

State Project Number: 0079-0240

Interchange Improvements to I-91 SB, I-691 EB & Route 15 SB

Proposed Improvements

  • A. New two-lane exit ramp from Route 15 SB to I-91 SB to reduce traffic congestion on the existing Exit 67 ramp
  • B. New two-lane I-91 SB ramp to Route 15 SB to reduce traffic congestion on the existing Exit 17 ramp
  • C. Widen ramp from I-691 EB to Route 15 SB (Exit 10) to two lanes
  • D. Widen ramp from I-91 SB to I-691 WB (Exit 18) to two lanes