Lane Closures possible Sunday 10/29 through Wednesday 11/8 between 7:00 PM and 6:00 AM as follows (except no lane closures are anticipated Thursdays, Fridays, and Saturdays during these two weeks):
- I-691 EB (Exit 1B to Exit 1) double left lane closure for traffic shift– Wednesday, 11/1 between 7:00 PM and 6:00 AM.
- I-91 NB (Exit 17 to Exit 20) double left lane closure for temporary barrier installation – Thursday, 11/2 between 8:00 PM and 6:00 AM.
- I-691 EB (Exit 1B to Exit 1) double right lane closure for traffic shift– Monday, 10/30 and Wednesday, 11/1, between 7:00 PM and 6:00 AM.
- I-91 NB (Ramp 5N 9N-2) ramp slow-down Sunday, 11/5, for temporary barrier installation
- I-91 NB (Ramp 9N 6E) ramp slow-down Sunday, 11/5, for temporary barrier installation
- CT Route 66 EB (Ramp 9N 6E to Ramp 6EPA) right lane closure, Tuesday, 11/7, for temporary barrier installation,
- CT Route 66 WB (Ramp PA 6W to Ramp 6W9N) right lane closure, Tuesday, 11/7, for temporary barrier installation
- Baldwin Lane Closure (alternate one-way traffic for temporary barrier installation, Tuesday, 11/31.
Ramp Closures (Between 10:00 PM and 6:00 PM)
- 11/1 — I-691 EB (Ramp 6E 9N) Ramp closure for traffic shift
- 11/1 — I-691 WB (Ramp 6W 9N) Ramp closure for traffic shift
- 11/7 — CT Route 66 WB (Ramp 6W 9N) Ramp closure for temporary barrier installation